Lane closures on U.S. 59 south of Avoca begin on Monday, April 1
March 26th, 2024 by Ric Hanson
COUNCIL BLUFFS, Iowa – March 26, 2024 – If you are driving on U.S. 59 one mile south of Avoca in the coming weeks you need to be aware of a lane closure that may impact your trip.
Crews will begin replacing the other half of the bridge on U.S. 59 beginning on Monday, April 1, weather permitting. The roadway will be reduced to one lane with a 10-foot lane width restriction. Trucks with wide loads traveling north of the work zone will be directed to use Iowa 83 and trucks with wide loads traveling south of the work zone will be directed to use U.S. 6.
You will be directed across the bridge with temporary signal lights.